Saturday, October 1, 2011


Solar tour was today, We had our 34 solar panels, skystream windturbine, geothermal, 400 gallon water collection and the Chevy Volt.

Friday, August 12, 2011

Bee keeping

Our first hive waiting for a colony of bees from a split. The wind comes in from the west and we put up a fence to block the wind for winter. This was done last year June 10th 2010.

Wednesday, August 26, 2009

Geothermal


The Hole Deal connected and sealed all the wells to make them pressure tight.




Last year we had Bratcher Heating and air came out an install a geothermal. I lost the pictures of the drilling of the wells but it was very muddy. They drilled down 160 feet in four places approx 10 feet apart. The Hole Deal did the drilling and attaching all the wells tubing together to go in to the crawl space.

Friday, October 3, 2008

Solar Tour

Tomorrow is the National Solar Tour. We were left off of the booklet but we are going to participate. We are trying to put together information to distribute.
I am looking into getting a meter to be able to keep track of the wind turbine energy generation. I will be taking out the quick disconnet from the back yard and putting in the meter.

Saturday, February 2, 2008

High winds and cold temperatures.

Now that we are in the coldest of the Illinois winter with some pretty high winds like we all know and love here, the turbine is stalling. We did have someone already install a new soft ware to make the skystream not stall at 32 degrees F. Now it stalls at 19. We contacted Southwest wind and they are working on the problem and will let us know when a new software/hardware solution has been made. We are not looking forward to bringing the turbine down and may get a bucket truck to do the install.

Winter in Illinois and solar panels

We found out today that the panels don't generate anything with a thick coating of snow. Our roof is about 42 degrees pitch so you can't stand on it in the summer time with out having ropes so it's very difficult to climb up on a 10/10 roof and remove snow off of the panels. We bought a extention rod with a squeegy on it to stand on a ladder and pull the snow down. This works well if the snow is light. We had a large snow fall and was almost impossible to clear. After we did get the snow off the power gernerated was even greater than ever. I think the reflection and the cool temperatures warranted this. We did have a second row of panel on the opposite side of the house and the snow just fell off of them.

Monitor for Skystream

We received our monitor and tried it out. I could not get the display to show me the Skystream. It was transmitting out but not back to the moniter. Then we started to have stalling moments with the skystream and couldn't get it to restart correctly. I tryed shutting the power down for 10 and 30 and 60 minutes without any change. I had to unplug and take the battery out of the moniter to get it to spin freely again. We called SouthWest Windpower and he had us turn the moniter on again and it did the same thing. They sent a new moniter and the same thing happened. I ended up sending the product back to Alter systems which they were gracious to let us since they did have a 10 day return policy. But we still were charge shipping to and from Alter systems and they deducted a 15% fee for restocking and 5% fee for canceling an order. So the all awaited monitering device and we still don't know what we are generating.

Thursday, October 11, 2007

Monitoring devices

I orderd the monitoring remotes for our Sunny Boy and the Skystream today.
Alter Systems on line shop is where I purchased them from. Right now they don't have the Skystream remote but they are contacting SouthWest wind to see if they can get it for us.
I hope to get all the wind speeds, solar Kw hours and other data and put it into a spread sheet.

Monday, September 3, 2007

55 ft Skystream in action

Here is a video of the Skystream in action.

Sunday, September 2, 2007

Lifting the tower.




Sterling, my youngest son came to help us raise the tower. The gin pole is connected to the opposite side of the tower base from the hinge. The gin pole is 20 feet long and weights approximately 300 lbs. The gin pole is secured to the tower base with 3 bolts and has a cable that connects to the other end. The cable is connected to the tower at about 15 feet from the top of the tower. This cable will off set the stress of the pull from the winch at the base. The gin pole has a second cable that runs down to the pulling source. I connected this end to my winch on my Jeep. For extra stablity I put 8x8 timbers in front of my wheels. The 9500lb winch had no problem pulling up the tower. Sterling is shown here watching, to make sure the foundation holes line up with the bolts, so we don't damage the bolt threads. Rena is on the winch, and watching the tower so it is going up safely. I am maning the gin pole and waiting for the tower to get to the balance point so I can slowly lower the foundation base over the bolts. Debbie, our friend is documenting the raising with pictures and video. We had some difficulty with getting the gin pole securing bolts to clear the washers and nuts. We got the middle bolts on first. Then the gin pole was loosened and the bolts where placed on those bolts. We had to loosen the hinge plate slowly and lower the hinge side of the foundation base to get the bolts placed on the last three bolts. The tower was then leveled with small torpedo levels on the base. Then later, we readjusted for level after watching the turbine head.














There was no wind that day so the only rotation of the Skystream was when a bird landed on the blade and it's weight made the blade turn. The first of these three picture shows the windturbine from the back yard and the second is a view from the front road. It shows our hybrid system of the solar and wind.


















Attaching the blades to the Skystream.





We have taken the blade plate and hub off of the Skystream. Rena is torquing the blades onto the hub to 50 ft/lbs. I picked up the entire assembly and placed it on the rotor shaft. Then I attached the nose cone. Here is the final product with Rena at 5 ft 1 and 1/2 in.

Attaching windturbine to tower



We placed the Skystream on my home built scaffolding. Connected the windturbine to the tower with the vibration dampeners to 80 ft/lbs of torque.

Tuesday, August 28, 2007

Connecting tower together


We connected the next section to the stubby base section and pulled it down 2foot 6 inches with two hand winches. Then we braces that section and added the next few sections the same way. We had to use dish soap/water to ease the towers together.

Stubby segment installed

We connected the first stubby segment to the hinge plate and gin pole. This helped with getting the bolts lined up so when the tower is raised the base will clear all the bolts and come down correctly. I had to use a sledge hammer to move the bolt to the correct alignment . After many adjustments I got a good alignment( The only reason that we had to do this is because the holes on the wooden template that they sent us had been positioned incorrectly. We contacted Green Ridge Wind Farms about this and they made corrections on their future templates.

Tower arrival


Our tower finally arrives from Green Ridge Wind Farms http://www.greenridgeenergy.com/. There are 5 pieces that weight about 200lbs a piece. We made a wooden ramp down the side of the truck and slowly lowered the tower segments with ropes onto the grass.





Tuesday, August 7, 2007

Gin Pole and Hinge plate








Just received the gin pole and hinge plate today. The hinge fits just great, even though our template holes were off slightly. I bolted the hinge plate on, at the exact height. The hinge plate is 4.25
inches from the top of the bolts and the other bolts opposite these are at 2.25 inches. We have not heard when we are getting the tower but we only have 4 more days for the concrete to cure.

Monday, July 30, 2007

concrete curing


The concrete has been curing for 14 days now and will have 14 days to go. No tower yet, but we're hoping that it will come soon. This picture doesn't do justice to the actual mass of this foundation. The concrete is 4 feet deep by 7 foot square. The bolts are actually 3 1/2 feet long and 5/8 inch in diameter.The l 1/2 inch conduit displayed is for the electical wire. We plan to landscape the area around the foundation with either grass or some kind of ground cover.