Tuesday, August 28, 2007

Tower arrival


Our tower finally arrives from Green Ridge Wind Farms http://www.greenridgeenergy.com/. There are 5 pieces that weight about 200lbs a piece. We made a wooden ramp down the side of the truck and slowly lowered the tower segments with ropes onto the grass.





No comments: