Saturday, February 2, 2008
Monitor for Skystream
We received our monitor and tried it out. I could not get the display to show me the Skystream. It was transmitting out but not back to the moniter. Then we started to have stalling moments with the skystream and couldn't get it to restart correctly. I tryed shutting the power down for 10 and 30 and 60 minutes without any change. I had to unplug and take the battery out of the moniter to get it to spin freely again. We called SouthWest Windpower and he had us turn the moniter on again and it did the same thing. They sent a new moniter and the same thing happened. I ended up sending the product back to Alter systems which they were gracious to let us since they did have a 10 day return policy. But we still were charge shipping to and from Alter systems and they deducted a 15% fee for restocking and 5% fee for canceling an order. So the all awaited monitering device and we still don't know what we are generating.
Thursday, October 11, 2007
Monitoring devices
I orderd the monitoring remotes for our Sunny Boy and the Skystream today.
Alter Systems on line shop is where I purchased them from. Right now they don't have the Skystream remote but they are contacting SouthWest wind to see if they can get it for us.
I hope to get all the wind speeds, solar Kw hours and other data and put it into a spread sheet.
Alter Systems on line shop is where I purchased them from. Right now they don't have the Skystream remote but they are contacting SouthWest wind to see if they can get it for us.
I hope to get all the wind speeds, solar Kw hours and other data and put it into a spread sheet.
Tuesday, September 4, 2007
Skystream Windturbine/ Sanyo Solar Panels Generating
This is our hybrid (wind/solar) system in action!
Monday, September 3, 2007
Sunday, September 2, 2007
Lifting the tower.

Sterling, my youngest son came to help us raise the tower. The gin pole is connected to the opposite side of the tower base from the hinge. The gin pole is 20 feet long and weights approximately 300 lbs. The gin pole is secured to the tower base with 3 bolts and has a cable that connects to the other end. The cable is connected to the tower at about 15 feet from the top of the tower. This cable will off set the stress of the pull from the winch at the base. The gin pole has a second cable that runs down to the pulling source. I connected this end to my winch on my Jeep. For extra stablity I put 8x8 timbers in front of my wheels. The 9500lb winch had no problem pulling up the tower. Sterling is shown here watching, to make sure the foundation holes line up with the bolts, so we don't damage the bolt threads. Rena is on the winch, and watching the tower so it is going up safely. I am maning the gin pole and waiting for the tower to get to the balance point so I can slowly lower the foundation base over the bolts. Debbie, our friend is documenting the raising with pictures and video. We had some difficulty with getting the gin pole securing bolts to clear the washers and nuts. We got the middle bolts on first. Then the gin pole was loosened and the bolts where placed on those bolts. We had to loosen the hinge plate slowly and lower the hinge side of the foundation base to get the bolts placed on the last three bolts. The tower was then leveled with small torpedo levels on the base. Then later, we readjusted for level after watching the turbine head.
There was no wind that day so the only rotation of the Skystream was when a bird landed on the blade and it's weight made the blade turn. The first of these three picture shows the windturbine from the back yard and the second is a view from the front road. It shows our hybrid system of the solar and wind.
Attaching the blades to the Skystream.
Subscribe to:
Posts (Atom)