Here is the foundation all formed up and ready for the bolts to be placed. The 5/8 rebar is 3 inches off the bottom and 3 inches away from the top of the forms. We placed the 1 1/2 inch conduit for the wiring that will come out about 1 1/2 feet down . I placed rebar from the bottom to the top mat to make it so that it was suspended. I had to place 2x4 blocks on each side to keep the top mat centered.


Here are the j-bolts attached to the template. The top of the j-bolts will be 8 inched above the finished foundation.










Here I am in the hole securing the j-bolts so they won't move ( or move much), when the concrete is poured.