Here is the foundation all formed up and ready for the bolts to be placed. The 5/8 rebar is 3 inches off the bottom and 3 inches away from the top of the forms. We placed the 1 1/2 inch conduit for the wiring that will come out about 1 1/2 feet down . I placed rebar from the bottom to the top mat to make it so that it was suspended. I had to place 2x4 blocks on each side to keep the top mat centered.
Saturday, July 14, 2007
Here is the foundation all formed up and ready for the bolts to be placed. The 5/8 rebar is 3 inches off the bottom and 3 inches away from the top of the forms. We placed the 1 1/2 inch conduit for the wiring that will come out about 1 1/2 feet down . I placed rebar from the bottom to the top mat to make it so that it was suspended. I had to place 2x4 blocks on each side to keep the top mat centered.